ZJ70LDB Compound Drive Drilling Rig

• Parameters

Drilling rig modelZJ70/4500LDB
Nominal drilling depth, m114mm(4 1/2″) Drill pipe4500-7000
127mm(5″) Drill pipe4000-6000
Max. hook load, KN4500
Hook speed, m/ s0.21-1.36/0.25-1.91
Line strung of hoisting system12
Drill line diameter, mm38
Max. pull of fast line, KN485
DrawworksModelJC70B
Rated Power KW1470
Speed6F(4F)+2R
Main brakeHydraulic disc brake
Auxiliary brakeEddy brake
Crown blockTC450
Traveling blockYC450
Sheave OD of hoisting system, mm1524
HookDG450
SwivelModelSL450
Stem dia, Mm75
Rotary tableTable opening mm952.5
SpeedⅠor Ⅱ, smooth change
Drive modelVFD motor
MastTypeK
Height, m45
Max. load, KN4500
Sub-StructureTypeFront level, swing lift; rear level, box
Floor height, mFront 10.5,rear 0.8
Clear height, m7.4/8.9
Mud pumpModel × numberF-1600×2
Drive modeCompound drive
Rotary electric drive modeAC-DC-AC or AC-SCR-DC, one for one control
Total power, kW3×1000/4×810

• Features

  • • The drawworks and mud pumps are driven by “diesel engine + coupling transmission + chain compound” while rotary table is driven independently by AC variable frequency motor or DC motor to obtain smooth speed and torque limited so that the drilling performance is improve.

• Rig floor is in two level “front high rear lower”. Power and transmission system are installed on the rear low level.

• Drawworks is inner speed change. Speed shift adjustment and change is easily available by remote pneumatic control.

• Main brake is hydraulic disc brake or band brake and auxiliary brake is eddy current brake.

• Box or front level with swing lift and rear level with box type substructure is available.

• Module design is provided for reasonable arrangement, power compensation and high use ratio. Ample space on rig floor is available for convenient operation.

• Compound can be used to drive the energy saving generator and automatic air compressor.

• Independent driller cabin is on the user’s requirements. To realize intelligent control of pneumatic, electric, hydraulic and instrument system so that driller completes the total operations in the cabin for better working conditions and lessening working strength. Logic control, supervision and maintenance during complete drilling operations are available by PLC process. The drilling data can be stored printed and remote transmitted.

• Integrated skid rail may be provided to meet requirement for cluster well drilling.

• Top drive drilling system could be equipped.